Does LEED cost more?

The answer to this will come over time as more case studies are documented. The USGBC took a first stab at the question by issuing a memo in August summarizing a number of case studies. In general, they found initial capital costs to be 1-4% higher than conventional buildings while long-term costs were “significantly lower”.
source: FAQ on LEED See also XlnkS4A3